MLALAD Scheme | MLALAD Guidelines

Member of the Local Legislative Assembly (MLALAD) Scheme :The government set up MLA Local Development Scheme is 2000-01 making MLA reliable recommended small natural capital development. The content of each Member’s regime has the option of proposing the Deputy Commissioner for his / her district given the magnitude of the year-to-year benefits added to his / her district. Each MP is sanctioned funds Rs.2 crore MLALAD per year for their respective constituencies of the central government.

The main features:

 

MLALAD Scheme | MLALAD Guidelines:The type of work under the basis of this regime in the nature of each person develops its felt locally
The work should be such that its interior for a previous year and the establishment of a sustainable asset it leads.
At least 10% of Assigned funds should be used in the state for capacity building and training of unemployed youth.
The work will be taken in MLALADS should not lakh under Rs. 1 in each box.
Works that can be included in MLALADS:

MLALAD Scheme | MLALAD Guidelines:

Belongs the construction of buildings for schools, inns, libraries and other buildings forming the government institutions.
The construction of village roads, bridges, public canals public irregation and drainage systems.
Provision of drinking water for the inhabitants of the area by digging tubular wells or other works that will contribute in this respect.
Construction of public health care buildings, public toilets and bathrooms, walkways, paths and driveways.
The construction of common gobar power plants, non-conventional power systems / community-use devices.
Awnings Bus / stops for transit passengers.
Social forestry, agriculture, forestry, horticulture, parks and gardens of government and municipal land.

MLALAD Scheme | MLALAD Guidelines:

DIRECTIVES ON

MEMBERS OF THE LOCAL PARLIAMENT
DEVELOPMENT PLAN
1. CONTEXT
1.1 Public approach Members of Parliament (MPs) for the provision of some basic
To meet the ongoing needs of human institutions.
1.2 December 23, 1993 The Prime Minister had members of the local Parliament Ad
Zone Development Scheme (MPLADS) in Parliament. Were among the MPLADS
The Ministry of Rural Development. The first guidelines were published in February
1994 for the design, implementation and monitoring of the program. The MPLAD
Scheme, the Ministry of Statistics and Program Implementation was
October 1994, the guidelines were subsequently revised in December 1994 February
1997, September 1999, April 2002, November 2005, August 2012 and finally May 2014.
This comprehensive revision of the guidelines is based on the experience of Acquired
Aged 22 and considered by the various stakeholders, including suggestions
Members of Parliament, the two Lok Sabha / Rajya Sabha Committees, NABARD
Consulting (NABCONS) and India’s ICT Controller and Auditor General
Reports.

MLALAD Scheme | MLALAD Guidelines:

1.3 The goal of the program is to allow MPs to allow development work
Nature focuses on the creation of sustainable community assets based on local tendencies
Must be taken into account in their constituencies. Since the establishment of the plan, a sustainable
The strengths of national priorities, namely drinking water, primary education, public health, hygiene
And roads etc. are created.
1.4 1993-1994, when the scheme was launched, a quantity of Rs. 5 lakh per member
The parliament has been excellent, which has been turned into a crore rupees a year according to the members riding
From 1994 to 1995. This was reinforced to Rs. 2 crore 1998-99 and now it’s Rs.5 Crore
In the 2011-12 financial year.

MLALAD Scheme | MLALAD Guidelines:
1.5 The Ministry of Statistics and the implementation of the program was responsible for the policy
Formulation and publication of fund requirements of the monitoring mechanism for implementation Scheme. A department in each state / UT as Nodal department designated with Overall responsibility for monitoring, monitoring and coordinating the MPLADS
Implementation with districts and other departments.

MLALAD Scheme | MLALAD Guidelines:The Government of India
The National Institute for Nodal MPLADS informs the district
The authorities. District officials claim to the state of implementation of the MPLADS
Government of India and State Nodal Department.
2
DIRECTIVES MPLADS
2. Characteristics
2.1 MPLADS is fully diet plan financed by the government of India. The annual MPLADS
The right of the fund constituency is Rs. 5 crore.
2.2 Lok Sabha members can recommend works in their constituencies and voted
The members of Rajya Sabha can recommend work within the framework of the election
Provided for 2.8 and 2.9 in the paragraphs. Called members of the Rajya Sabha and Lok Sabha
Can recommend works anywhere in the country.
2.3 A member must specify the circle Nodal in Annex I of the selection
Guidelines of the Ministry of Statistics and the implementation of the program with a copy
The state government and the district councilor of the elected district. If a Lok Sabha
The district covers more than a quarter can choose the member
One of the districts as Nodal district in his constituency. The Rajya Sabha MP
Select any circle in the state election as Nodal District.

MLALAD Scheme | MLALAD Guidelines:

Appointed members Rajya Sabha and Lok Sabha can choose any county in the country as district Nodal.2.4 All work to meet the needs of local infrastructure and facilities, focusing onThe creation of permanent assets allowed in the riding under MPLADS except for those
Banned in Annex II. The expenditure on certain elements of nature are also not sustainable
Authorized as listed in Annex IIA.
2.5 Development of areas inhabited by the planned caste and line trunk before
A larger need to develop areas by planning planned boxing and tribes
To pay particular attention to the development of the infrastructure of these areas. M.Ps are
Recommend it every year, labor costs by at least 15 percent of MPLADS law
For the year to the areas covered by the planned box population and 7.5 percent for inhabited areas
Inhabited by S. T. Population. In other words, to a lot of Rs.5 Crores has M. P Muss
Recommended for the populated areas of S. C., Rs.75 Rs.37.5 Lakes and lakes
Inhabited by S. T. Population. If there is not enough of tribal people in the area
Lok Sabha member, they can recommend this amount for the creation of the community
Assets in the tribal areas outside their districts, but in their citizenship. if
A state does not have S. T. inhabited areas, this quantity can be in inhabited S.C. be used,
Areas and vice versa.

MLALAD Scheme | MLALAD Guidelines:

It is necessary to force the district administration
Order of the Directive. In order to facilitate the implementation of this Directive, it is
Be responsible for the district competent authority taking into account the applicable provisions of the state
And the central government the areas that declare for the use of the funds for
Benefit from the SC & ST population.

MLALAD Scheme | MLALAD Guidelines:

3 MPLADS POLICIES
2.5.1 The additional amount of Rs.25 lakh may not be issued in the tribal areas:
Encourage trusts and businesses for the improvement of tribal populations, the upper limit of Rs. 50 lakh
For the construction of assets by trusts and corporations in Section 3.21.2 of the Guidelines
Be increased by 50% to Rs.75 lakh under conditions (a) The Municipality Construction
Mainly benefit tribal people in tribal areas. (B) the work performed and
The Trust / Company Beneficiary must meet all other conditions of the MPLADS Guidelines.
In the planned tribal areas and notified areas where the transfer of ownership of land
Probably, MPLADS works for the creation of community assets can be managed by the
The very practice by which the government carries out the creation of all the other
Public works, such as schools, hospitals, roads, etc., among other central / regional governments
Development program. However, this is subject to the conditions of an enterprise
Landlord is not required to claim rights to land or property
Then, created once the country receives the government for public use and is
Free access for the use of the asset by all members of the community in addition to completing all
Other conditions of the MPLADS guidelines.

MLALAD Scheme | MLALAD Guidelines:
If a constituency 2.5.2 has difficulties in implementing the provisions on SC / ST,
As in MPLADS policies, due to insufficient SC / ST – population,
The exemption from the proposed provision for the use of MPLADS funds,
The competent Nodal District Authority with the prior approval of the Ministry of Statistics
And the implementation of the program. The Nodal Authority of the relevant district, in consultation With the members concerned, send a justified and logical proposal for the
Seek the government by using the agreed amount for the welfare of others
Economically, disadvantaged population groups in the riding.

MLALAD Scheme | MLALAD Guidelines:
2.5.3 Regional authorities should provide information and data on the implementation of
Provide SC / ST areas, including mutual support of funds and equally
On a quarterly basis at the service of the node of the government of the State.
2.6 Recommendation / Assignment of Work: Each Member shall recommend to the
Authorization in the course of the year in the form of Annex III of the data subject
District office. The district authority will receive the eligible works as sanctioned
After the established procedures of the government of the State. (On the issue of technical sanction, Invitation to tender / non-tender, collective invoices, etc. The powers to impose administrative / The authorization will remain with the district office).

MLALAD Scheme | MLALAD Guidelines:

2.7 Natural and artificial disasters: MPLADS work can also be implemented in the fields of
Vulnerable or disasters such as floods, cyclones, tsunamis, earthquakes, hail storms,
Avalanche melts Cloud, pest control, landslides, tornado, drought, fire, chemical, biological
And radiological risks Lok Sabha deputies from unaffected areas of the state can also
4 MPLADS POLICIES

Recommend eligible works up to a maximum of Rs.25 lakh per year in affected countries
Zone in that State. The funds would be released by the Nodal District of the member in question
To the district authority of the affected area. The MPLADS fund may deviate from
District authority for the eligible work in the guidelines. the
Amount, the district affected by the node district on natural disasters is transmitted may be
District transmitted as consult Presentation amount UCS and affected MPRs on natural disasters
For reclamation work, production report, inspection certificate and use
Certificate for such work and money is from the district office of
Districts directly assigned to the Ministry of Statistics and the implementation of the program for
Total Reconciliation UC Report Not Separated / AC / Completion with Respect to Transfer
Amount would be required by the Nodal District Authority in this regard during processing
Released the next tranche of funds from MPLADS.
2.7.1 Nodalabteilung identifies rehabilitation work in one month
Commitment of MPLADS funds and rehabilitation work should be completed
The competent district office within 8 months of approval of the work. in the case
It takes more time to complete the work, the nodal ministry, in consultation with
MOSPI may grant the appropriate time for the completion of the work.

2.8.1 Nodal Department identifies the reconstruction work within one month
The commitment of funds from the MPLADS and reconstruction work is to be supplemented by
The competent district authority within 8 months after the approval of the work. if
It takes more time to complete the work, nodal department, in the consultation with
MOSPI can allow more time for completion.
2.9 Contribution of the MPLADS Fund to a location outside the MPS or outside its electorate
Region / UT: when elected considers it necessary that the funds contribute to MPLADS
5  DIRECTIVES MPLADS
At one point outside this state / UT or outside the district of the state or both, MP
Eligible work according to the guidelines may recommend Rs up to. 25 Lakh in
One business year. Such a gesture by a deputy promoting national unity, harmony,
And brotherhood among the people at the base. In such cases, the district is Nodal
The authority will be fully responsible for the coordination and other tasks as assigned
In the guidelines. The final report, certificate of use and test certificate
For this work will be provided by the enforcement authority to the district
Nodal District Office received the funds.

MLALAD Scheme | MLALAD Guidelines:
2.9.1 Provided that the contribution is not permitted outside the district / state /
Companies and cooperatives.
2.10 District Administration: District Collector / District Council / Deputy Commissioner
As a rule, the MPLADS district authority in the district is to be implemented. When the circle
The planning committee is authorized by the state government, CEO of
The district planning committee can function as a district administration. In the case of Municipal
Company, Commissioner / CEO work as a circle
Authority. In this regard, if there is any doubt, the Indian government in consultation with
The regional government / UT will decide the district authority for the purposes of the MPLADS Implementation.

MLALAD Scheme | MLALAD Guidelines:
2.11 Guiding place:
(A) The district authorities will make the selection of a suitable implementation
Agency, through which a work recommended in particular by a MP would be carried out;
B) The choice of the management authority shall be in accordance with
The rules / guidelines of the government of the state applicable to this purpose. provided
For some jobs in some departments / central government organizations (such as
Railways), where the carrier must necessarily be affected
The department / organization of the central government will be the same as elected
Implementing Agency.

6 MPLADS METHODS
3. IMPLEMENTATION
3.1 Each member of the House of Commons recommends work eligible for the duly signed by deputy head of deputies
A letter format for MPs to district authority is in Appendix III. recommendations
Third parties and representatives of MEPs are not allowed and can not be modified.
3.2 If a district of more than one district is and wishes to recommend to the member
Working in the neighborhood, except for the Nodal district, in such cases, the list of works in the The required format will be submitted to the Nodal District Regional Office a copy
For the district authority in whose area the proposed works are to be carried out.

MLALAD Scheme | MLALAD Guidelines:
The authority of the district in whose jurisdiction the proposed work is to be performed,
Maintain accounts, appropriate procedures for the sanction and implementation of
Timely completion of the work. District authorities will submit monthly reports,
Work of final reports and certificates for such work in Nodal district
Authority.

MLALAD Scheme | MLALAD Guidelines:
3.3 The district authority shall appoint the executing agency which is in a position to
The quality of work eligible, timely and satisfactory. The district authorities will follow
The process of work put in place; Technique, estimation of work, tenders and management
Process Concerned / UT State – Government in the performance of work and
Responsible for the timely and effective implementation of these activities.
3.3.1 Completion of Abandoned Work / Suspension: If there was no end of series /
Suspended MPLAD work under the program, it will be completed by the regional government
From its own resources. The government of the State will also take responsibility and make necessary
Disciplinary measures against civil servants. The authority of the county may ensure that the
The funds must have been used earlier than sanctioned, so that the duplication of the distribution of
The funds will not be held.
3.4 The work and selected for the execution of the work by the deputies point can not be modified,
With the exception of the approval of the members concerned, but the change is not allowed once the
Work began and created the allowance.
3.5 If the district authority considers that a recommended work can not be carried out because of  Intimation to the Government of India and the Government of the State / UT as soon as possible  But no later than 45 days from the date of receipt of the proposal.
3.6 The district authority should be a firm commitment on the operation in advance,
Maintenance and maintenance of the proposed asset of the user organization before
The execution of the works is sanctioned.

MLALAD Scheme | MLALAD Guidelines:

7 MPLADS POLICIES

3.7 The county authority may work as recommended by members of the
Complete authorization. Unblocking of funds is regulated in these provisions
Guidelines
3.8 Where the estimated amount for the work is more than the amount of the
At the same time, the consent of the deputies before the sanction is necessary.
3.9 The work shall be sanctioned and carried out when the member concerned, the
Estimated total cost of labor per year.

MLALAD Scheme | MLALAD Guidelines:

If a commitment for the estimated amount
Not preferred and recommended by quantity MP is lower than estimates
For work and there are no other sources whose deficit can be good,
Then, the work should not be sanctioned, the project remains in such a
Incomplete lack of sufficient funds. The shortfall in estimated costs relative to a
Recommended by the Member to the Member should be announced as soon as possible, but no later than
75 days after the receipt of the proposal.

MLALAD Scheme | MLALAD Guidelines:

10.3 If the recommendations received from the district authorities exceed the authority of the district authority
MP, priority is obtained by the principle of the first to be considered first.
3.11 All operations were received for the recommendations of the District Administration Office
Until the last date of the term of office of the Members to be elected, if they comply with
And within the authorization of MPLADS funds from MP.
3.12 All recommended eligible work should be sanctioned within 75 days of the date of acceptance
Receipt of the recommendation, after the completion of all formalities. The Regional Office
However, informed MEPs about the rejection, if any, within 45 days from the date of
Recommendations, with reasons therefor.

MLALAD Scheme | MLALAD Guidelines:
In the case of time limits in the part of the operating period of
Code of Conduct, which was notified by the Electoral Commission, then such a period
Model code does not appear within billing deadlines.
3.13 The appropriate sanction / timetable shall set a time limit for the completion of the work Implementing agency. The deadline for the completion of the work should not normally Exceed one year.

MLALAD Scheme | MLALAD Guidelines:

In exceptional cases where the execution time exceeded one year,
Specific reasons are included in the letter / sanction order. punishments
Writing / Controlling also contains a clause of appropriate measures against the implementation
Agency in case of their inability to complete the work within the agreed time
State government procedures. A copy of the sanction / contract letter is sent to MPs
concerned.
14.3 decision-making powers in respect of technical, financial and administrative penalties to be
, Gilet will be awarded to district level officials under the scheme. To facilitate quick
8
MPLADS POLICIES
Implementation of projects under this program, if the powers of the State /
UT governments to district officials.

MLALAD Scheme | MLALAD Guidelines:

The district authorities shall have full powers
To obtain the technical approval and provided by the competent professionals work
The district authorities before administrative sanction and final approval.
The district authority must ensure that all approvals for
This work has been undertaken by the competent authorities and the work corresponds
Guidelines
3.15 The work that has once been recommended by the House of Representatives and sanctioned by the district authority may be
Canceled if the Member’s request, when the work has not started and
Termination does not give rise to contractual financial liability / costs to the government.
If for some compelling reasons is to stop / quit the current job
Inevitably, the matter should be referred to the Nodal State Ministry with full justification
For a decision recognizing the Government of India and the Members concerned.
Such work can not be changed by the member, even if the member is re-elected. It is the responsibility of
The Nodal District Authority to review all such recommended work within 75 days
The last date of the term of office of Members of the
The guidelines and the rejection, if any, indicated to the leaver / former member within 45 days Reasoned.

MLALAD Scheme | MLALAD Guidelines:

Nothing in this clause authorizes any successor deputy otherwise qualified to break off work
Recommended by his predecessor.
3.16 After receiving the recommendation of the work of the member and the working problem
Sanction certificate from the district authority, the district authority should ensure that the details
Sanctioned work will be included in the input format (Annex IV A, B, C, D and E)
And be downloaded from the MPLADS website (www.mplads.nic.in). Everything is already running
Or run must go through a similar process and all entries made in
A way to get time together.

MLALAD Scheme | MLALAD Guidelines:

The software manual for monitoring the work is under MPLADS
Available on the website.
3.17 MPLAD system can converge in individual projects / other autonomous
The state government plans provided the work of central government and state systems
Are eligible MPLADS. The resources local organizations can also be grouped with
MPLADS works. Wherever such a concentration has taken place, funds from other sources
If first and MPLADS funds are used, should be released later, MPLADS means funds
The results of the project.
3.17.1 Special provision for the convergence of the deputies
(MPLADS) with MGNREGA: Medium Local MP
The Development Plan (MPLADS) with MGNREGA will be implemented with the aim
Create durable goods.
9 DIRECTIVES MPLADS
(The exact procedure is given in Annex IIA)
3.17.2 Special provision for the convergence of the deputies
(MPLADS) with Khelo India: National Program for the Development of Sport:
The resources of the local MP development program (MPLADS) can
A convergent with Khelo India: National Program for the Development of Sports with
Goal to create long-lived assets.

MLALAD Scheme | MLALAD Guidelines:
(The exact procedure is given in Annex IIA)
3.18 Members may recommend an increase by a certain amount of their funds MPLADS
A scheme, promoted by the central government against the central part of the state, the place
And the quantity recommended, but is not allowed
Enter the recipient who will continue to be in all previous list / priorities list already
Written by the district administration and the list does not change the registration required
MP.
3.19 The public and community contribution to the work of members recommended is permitted. in
These cases MPLADS funds will be limited to the amount estimated to be less public and
Community contribution.
3.20 There are central government plans and government that provide the public and
Community contribution. MPLADS funds should not be used to replace the public and
Community contribution in any program / central / regional government regime
Contains a component of this post.

MLALAD Scheme | MLALAD Guidelines:
3.21 The municipal infrastructure and public utilities construction are also allowed
Registered companies / trusts provided under the plan is that the company / trust deals with
The activity of social service / welfare and for three years.
The existence of the company / trust is counted from the date on which it is operated in
The field or deadline under the respective Registration Act, whichever is later.
The company / trust recipient must be a not-for-profit company, public and non-profit
Entity, enjoys a good reputation in the region. Is such a company / trust applies or
No, which is decided by the competent district office on the basis of relevant factors,
As a performance in the field of social work, social activities, non-profit orientation
Its activities, the transparency of its activity and its financial strength.
3.21.1 Property of the country can remain with the company / trust, but the structure is built
The MPLADS funds will be owned by the region’s government / UT. The company / Trust
Commit to operate, maintain and maintain the assets created under its MPLADS
Costs. If at any time it is determined that the asset created with the MPLADS Fund is not used
The purpose for which the assets were financed can be supported by the regional government / UT
ten
DIRECTIVES MPLADS

MLALAD Scheme | MLALAD Guidelines:

Assets and the originally taken over from the company / trust, the cost of MPLADS
For the creation of assets, as well as interest at the rate of 18% per annum
Effect of the date of use of MPLADS funds for the agreed work. A formal agreement
(A model contract form in Annex V) by the company / trust with the
District authority in favor of the government in advance for that purpose. This agreement
Entered on non-judicial stamped paper after the relevant registration law
Rs.10 or higher as in State / UT. It would not be stamp duty required
For registration as there is no formal transfer of assets.

MLALAD Scheme | MLALAD Guidelines:

3.21.2 No more than Rs.50 lakh may be issued by MPLADS funds for one or more works of
A particular company / trust in the life of this company / trust. If a company has already
Up to Rs. 50 lakh of MPLADS funds, but no funds can be recommended more
Company / Trust under the Plan. As of fiscal year 2012-13, a Member may recommend
The funds do not until Rs. A crisis overall, in an exercise of the MPLADS Fund works
For companies / trusts. The recommendation of Hon’ble members for the period
The 2012-13 fiscal year is in effect in the existing guidelines for this period.
3.21.3 MPLADS funding is not permitted for a corporation / trust if the recommendation or MP Each member of the family is the President / CEO or member of the General
Committee or trustee of the registered company / trust in question. Members of the family would Include the member and his / her spouse, their parents, brothers and sisters,
Children, grandchildren and their spouses and parents-in-law. Members can safeguard the spirit of The guidelines will be maintained by avoiding a trusts / corporations or circular mutual funds.

MLALAD Scheme | MLALAD Guidelines:
3.21.4 If further including means for a company / trust recommended by a Member of Parliament  And clarifications / documents in accordance with the guidelines for review
Required by sanctions of district authorities, society / trust
The necessary documents within three months of the date of receipt
The letter from the district administration.

MLALAD Scheme | MLALAD Guidelines:

If the documents are not received
After a period of three months, the district administration may issue two warnings
a month. If the requested information is not received, the recommendation of the
In the direction of the company / trust may be treated by the district as canceled
An indication of what can be given to MP reception. 3.21.5 Relaxed care for the most disadvantaged segments: for non-profit trusts / companies
Houses for orphans (anathalaya / yateemkhana), charitable houses for
Elderly / old charity houses for widows, charity houses /
Colonies for, leprosy charities for the blind, charities Apartments for mentally handicapped / spastic children / charitable homes for the deaf and  Bring stupid children to it, MPLADS funds up to Rs.50 lakh in their lives Is relaxed crore at Rs.1. The total MPLADS funds under this.

MLALAD Scheme | MLALAD Guidelines:
11 MPLADS POLICIES
Relaxed exemption will be used and non-profit and dormitory / colony
(And not for any other purpose of the relevant trust / corporation). and
The equipment shall be used only for the measures provided for in paragraph 3.21 of the Guidelines.

MLALAD Scheme | MLALAD Guidelines:
3.21.6 Mandatory inspection of per cent of all work performed in MPLADS
Trusts / companies during the year MPLADS – obtaining funds are the
Auditors who verify the MPLADS funds annually in the districts and a certificate on it
The effect is also included in Annex IX “Test certificate”
Guidelines for MPLADS.

MLALAD Scheme | MLALAD Guidelines:

In each quarter, work MPLADS with the agencies.
The district administration, the members of these review meetings concerned invite and
Send a report of these review meetings of the Ministry of Statistics and Program
Implementation.
(Vii) The district authority is responsible for solving examination objections raised in examinations
Reports.

MLALAD Scheme | MLALAD Guidelines:

29 DIRECTIVES MPLADS
(Viii) the Nodal District Authority will submit the government’s monthly progress report
In India, the government of the State / UT and the member concerned for each deputy concerned is separated Format in Annex VI by 10 at the latest next month. in relation to
When performing work in the SC and ST areas, financial and physical details will be
Provided in Section IV and V format in Annex VI.

MLALAD Scheme | MLALAD Guidelines:
(Ix) According to Section 4.8, the Nodal District Authority will report to the State / UT
The government talks about the unused balance of the member elected Rajya Sabha affected. it
The information provided in paragraphs 4.9 and 4.10 must also be reported to the Indian Government.
(X) The Nodal Department of State will monitor the fund to monitor MPLADS
Through the deputies, to ensure that the funds are used at the time by the county authorities,
Execution of restoration work. The Nodal department also provides for the submission
Especially monthly progress reports on the use of MPLADS resources for transport
The restoration work in the districts affected by the natural disaster.
6.5 The role of management
(I) responsible agents of agencies implementation regularly
Visit the workplace to ensure that the work is progressing well
The prescribed procedures and specifications and timetable.
(Ii) Implementing bodies should create the material and financial progress of the individual jobs
In the district every month with a copy to the State Department.
The managers should also provide the report to the soft format. A work
The register shall also keep information from the implementing bodies
Material and financial progress of the projects carried out by them. This register
Should also contain details of the on-site visit carried out by the implementing agencies.
The management must examine 100% of the work.
(Iii) The implementing bodies must provide a final report / certificates and the use
Certificates to the district authority within one month after completion.
(Iv) the management offices also pay the savings to the district head
(Amounts balance) including any interest to them within one month.

MLALAD Scheme | MLALAD Guidelines:

30 DIRECTIVES MPLADS
7. APPLICATION OF THE GUIDELINES
7.1 The directives come into force with immediate effect. These guidelines MPLADS
C) cite existing policies and instructions are issued under them.
7.2 Clarification, if any, of MPLADS guidelines or interpretation of a provision
These guidelines should be referred to the Ministry of Statistics and the Program
The implementation and the decision is final.
31 DIRECTIVES MPLADS

MLALAD Scheme | MLALAD Guidelines:

Authority in SC and ST; (B) complaints of consideration and questions of
Audit and recovery certificates.
(Iv) The Government UT State and authorizes the district authorities,
Other officials of the district of technical and administrative powers for the implementation of
MPLADS
(V) may arrange for the training of district / state government chairpersons
With the implementation of the MPLAD program.
(Vi) The government of the State / UT can not authorize their officials under the rank of vice To watch MPLADS Secretary / Executive Engineer how and when they do
Official field visits can also verify the number of works MPLADS and control
Controlled by the district authorities.

MLALAD Scheme | MLALAD Guidelines:

District authority is mandatory Inspection registers – one for the details of labor inspections carried out by the Trusts / Corporations under section 21.3 and the second for details of the works presented Other law enforcement agencies, including NGOs that implementing agencies Nodal State Public servants should consider at least 1% of MPLADS working in the neighborhood Year and an inspection register should be maintained at the state level and follow-up In inspections, results should be considered.
(Vii) The Government of the State / UT is authorized by the Audit Committee and the Accountant General of the State / UT, an auditor for auditing the accounts of each MPLADS
District office. For the purposes of continuity, the same auditor may (if the wishes of the State) Continued for three years and all new appointments until if a January
Calendar year for the next three years.

MLALAD Scheme | MLALAD Guidelines:

(Viii) State / UT government raises data on implementation of MPLADS in state
Their websites
(Ix) The State / UT Government distributes the unspent balance of Rajya Sabha deputies as
Defined in paragraph 4.8.
28  MPLADS POLICIES
(X) Nodalabteilung in states should coordinate with district authorities
Timely submission of certificates of use and examination certificates. A delay in the presentation of these documents, Question with the district authorities and ensure timely submission of these documents At the Ministry of Statistics and the implementation of the program.

MLALAD Scheme | MLALAD Guidelines:

(Xi) The State Level Monitoring Committee will examine the physical and
The financial progress of MPLADS – means to carry out rehabilitation works
Areas affected by natural disasters.
6.4 Role of District Authority: The role of the regional office is described in various forms
The paragraphs of the guidelines. The role of the Regional Office for Coordination and
Monitor appears.
(I) The regional authority would be responsible for overall coordination and monitoring
Work under control at the district level and inspect at least 10% of the work
As part of the implementation of each year. District authorities should involve MPs
Project inspections where possible.
(Ii) The district authority shall apply the provisions of paragraph 2.5
Twice for 15% and 7.5% of agent for MPLADS work in the ST and SC range
respectively.
(Iii) the district office leads to the working register indicating the position of the different Member States
To provide work that is recommended by MPs, and working details with a photo
Each job costs Rs.5 lakh or more, to the department in the prescribed format and
Lift the same on the MPLAD website.
(Iv) The district authority shall also keep a record of all
Quota funds and then transferred to the user organizations.
(V) District authorities will inspect all work performed by / for businesses and trusts
MPLADS and ensure that the conditions are met within the framework of the contract
with. In the event of a breach of a provision of the contract, measures under
An agreement is reached by the district authority.
(Vi) The district authority shall review each month and in any event at least once 3.22 Once work has been completed, it must be used for public purposes. For
Greater public awareness, for all work under MPLADS running a record (Rock / Metal)
Labeled the title “The work of the local parliamentary development program”
The indication of the associated costs, start date, completion and inauguration and
The name of the item, the project sponsorship should be permanent. A sample plaque
Is set out in Annex XI.

MLALAD Scheme | MLALAD Guidelines:
3.23 The list of all works completed and running with the MPLADS Fund should also be displayed
The District Office and published on the website for information on the general
Public. For public awareness, the details of completed orders are largely displayed
Places like the offices of Tehsil / Niabat / Sub Tehsil / Block / Gram Panchayat also.
3.24 In accordance with the law of 2005 on the right to information and rules set out here
All citizens have the right to have information on all aspects of the system and MPLAD
The recommended work / sanctioned / implemented under it. This may contain information,
The work recommended by deputies, works sanctioned / non-sanctioned cost of labor
Sanctioned agencies, the quality of work, the user agency implementation etc.
District authorities are responsible for providing this information to the public in the manner and manner According to the law of 2005 on the right to information.
Ambulances 3.25 / Bicycles Houses can be purchased through the district / district office
Chief Medical Officer on the recommendation of a deputy.

MLALAD Scheme | MLALAD Guidelines:
(The exact procedure is described in Annex II A)
3.25.1 Vehicles for the transport of animals: purchase of hospitals for the sick and injured animals
Nature reserves and national parks.
3.25.2 Outpatient clinics for sick or injured animals can also be purchased through the district
Authority in the pilgrimage church of wild and national parks on the recommendation of a member
Parliament (point 3.25.1). The field will now expand the purchase of hospitals,
For the transport of animals sick / injured in the district.
12 DIRECTIVES MPLADS
(A detailed approach is found in Annex IIA)
3.26 minimum for a project: the minimum of MPLAD sanctioned amount
The pattern for any project or work should generally be no less than Rs. 1 lakh. However, if the
The district authorities consider that the work will benefit less
The general public can have the same sanction, even if labor costs are lower
Rs. 1 lakh.
3.27 Shelf Project: The district authority is receiving and providing a “Shelf
Projects, “including projects for the settlements SC / ST MPs. The storage of projects should Be suggestive only so it is the flexibility of the MP offers to go over the list in the order To meet the felt needs of the people. The district administration can receive suggestions Panchayati Raj institutions and local facilities.

MLALAD Scheme | MLALAD Guidelines:

3.28 the MPLADS Fund for the Welfare of People with Disabilities Use: MPs can
Recommend at maximum Rs.10 lakhs per year or the consolidated amount
Their remaining amount in fact 2011-12, at any time their MPLADS to help disabled people. Such support will Only for the purchase of three-wheelers (manual / battery / engine), the engine / Wheelchair cells and artificial limbs for deserved individuals.
The granting of artificial limbs, etc. can only be given by an honorary member to a person, and that Other respected members can then add other subsidies to the same person. Clubbing grants MPLADS is not allowed for deputies to one person.

MLALAD Scheme | MLALAD Guidelines:

(A detailed approach is found in Annex IIA)
3.29 Purchase of books for schools, colleges and the public library: books, provided
Rs. 22 Lakh for schools, colleges and public libraries belong Central purchase,
States, UT and local autonomy MPLADS Fund.
(Details of the ceiling of such a purchase can be found in Annex IIA)
3.30 Purchase of computers: the purchase of computers allowed for the government and
Educational institutions supported by the government.

MLALAD Scheme | MLALAD Guidelines:

(Detailed rules are contained in Annex IIA)
3.30.1 Purchase of sight devices: delivery / assembly of sight devices
Authorized educational institutions supported by the government and the government.
MLALAD Scheme | MLALAD Guidelines: